Formwork, Scaffolding and Steel Structure Supply

News

Construction Materials Packing: What to Confirm Before Dispatch
Plywood, timber beams, scaffold members and steel sections need different packing information. Connect package labels and protection requirements to the confirmed supply list.

Ringlock Scaffolding: Preparing a Compatible Component Schedule
A ringlock enquiry needs more than a total tube quantity. Identify the system series, component lengths, connection details and packing groups before the supply scope is confirmed.

Film-Faced Plywood and H20 Beams: Details to Confirm Before Ordering
Sheet dimensions, core construction, beam lengths and supporting arrangements all belong in a formwork enquiry. Here are the details to prepare for plywood and H20 timber beams.

HZXG Adds Its First 10 Construction Products to the Online Catalogue
Explore HZXG's first 10 online product pages, covering formwork, scaffolding, structural steel and suspended access equipment, with specifications and packing information.
